NH12, Natun Durgapur, Kalirhat, Near Sani Mandir, Nadia, West Bengal – 741102 | GSTIN: 19ARWPS6326C1Z8 PAN: ARWPS6326C
Official Delivery & Deployment Policy

Delivery & Installation Policy

Physical Installation Timelines, Equipment Setup, and Activation Procedures

Rapid 24–48 Hour Setup Optical Fiber Drop & Coaxial Cabling Rx Optical Calibration (-18 to -24 dBm) Nadia District, West Bengal
BUSINESS ENTITY Sky Luck Verified
PROPRIETOR & DIRECTOR Biplab Kumar Saha
GST REGISTRATION 19ARWPS6326C1Z8
TAX IDENTIFIER (PAN) ARWPS6326C
Mandatory Policy Guidelines

Physical Installation & Service Activation Procedures

Active Guidelines

As a telecommunication and cable television provider, Sky Luck delivers tangible hardware installation and digital service provisioning across Nadia, West Bengal.

1. Installation Timelines

Upon verification of network feasibility and booking confirmation, physical installation is typically completed within 24 to 48 hours.

2. Technician Visit & Cabling

Our certified technicians visit your premise to lay high-grade optical fiber drop cables or coaxial cable lines from the nearest distribution node to your interior premises.

3. Device Configuration

Technicians configure your Wi-Fi ONT router, optimize optical signal levels (Rx power between -18 dBm to -24 dBm), pair set-top boxes, and demonstrate live internet speed and television channels before handover.

4. Proof of Delivery

Subscribers sign a physical or digital Installation Verification Slip confirming successful setup, signal testing, and receipt of hardware devices.

Sky Luck Gold Standard Setup Commitment

Every optical drop cable laid across Nadia undergoes high-precision fusion splicing with core-alignment technology. Our technicians verify both download and upload throughput, confirm zero optical packet loss, and hand over a verified subscriber slip before marking the installation complete.

Workflow Progression

Complete 5-Stage Delivery & Provisioning Workflow

From initial inquiry to live internet browsing and television broadcasting, our field engineering teams follow a structured protocol designed for maximum reliability:

Stage 01
Booking & Feasibility

Our dispatch desk verifies your GPS location in Nadia against our nearest optical fiber splitters and distribution nodes within 2 to 4 hours of booking.

Stage 02
Engineer Dispatch & Cabling

Certified technicians arrive equipped with armored outdoor optical drop cable, secure pole clamps, and interior wall clips to route lines neatly into your home or office.

Stage 03
Optical Calibration

Using digital optical power meters, technicians measure received light power, tuning splice points to guarantee optical Rx between -18 dBm and -24 dBm.

Stage 04
Hardware Provisioning & STB Pairing

Technicians configure the Optical Network Terminal (ONT) Wi-Fi router with secure WPA3 encryption, pair digital HD Set-Top Boxes, activate channel smartcards, and optimize home signal coverage.

Stage 05
Live Speed Demo & Handover

A live demonstration of full internet speed and high-definition television channels is conducted. You sign the physical/digital Proof of Delivery (POD) and receive an official tax invoice.

Hardware Specifications

Delivered Customer Premises Equipment (CPE)

All equipment delivered and installed at your premises is certified, high-grade telecommunications hardware tested for 24/7 continuous operation under tropical weather conditions:

Dual-Band Wi-Fi ONT Router GPON / EPON Optical Terminal
  • Dual-band 2.4 GHz + 5.0 GHz concurrent Wi-Fi (AC1200 / AX1800).
  • Gigabit Ethernet LAN ports for ultra-low latency desktop/console gaming.
  • High-gain external MIMO antennas (5 dBi) for thick wall penetration.
  • Built-in optical diagnostic web interface showing live dBm levels.
Digital HD Set-Top Box (STB) SITI Digital / GTPL Platform
  • 1080p Full HD resolution with crystal-clear HDMI 2.0 digital output.
  • Dolby Digital 5.1 surround sound audio passthrough.
  • Interactive 7-day Electronic Program Guide (EPG) with language selection.
  • Multi-function learning remote control compatible with smart TVs.
Outdoor Armored Optical Drop Cable G.657.A1 Bend-Insensitive Fiber
  • Heavy-duty UV-resistant LSZH outer jacket for direct outdoor sun exposure.
  • Dual steel / FRP strength members resistant to high wind tension.
  • Ultra-low bend radius preventing attenuation around sharp interior corners.
  • Pre-terminated SC/APC green connectors for ultra-low insertion loss.
Complete Premises Installation Kit Fasteners, Clamps & Accessories
  • Fiber terminal rosette box for safe indoor termination and wall mounting.
  • Power adapter with built-in surge protection for rural voltage stability.
  • Cat6 RJ45 Gigabit Ethernet patch cable (1.5m) for direct computer linkage.
  • HDMI cable (1.5m) and Composite RCA cable for legacy television sets.
Equipment Ownership & Bailment Terms: Customer Premises Equipment (ONT Router, Set-Top Box, Smartcard) remains the bailment property of Sky Luck or its authorized partner networks. Subscribers are provided hardware under an equipment security deposit. Upon subscription discontinuation, devices must be returned in good working condition to obtain deposit refund.
Coverage Feasibility

Nadia District Installation Coverage Matrix

Enter your town or locality in Nadia district below to check your installation turnaround time:

Real-time Feasibility Engine
Direct FTTH Node Connected
Estimated Installation: Same-Day to 24 Hours Kalirhat & Natun Durgapur are directly connected to our NH12 optical backbone ring. Rapid same-day technician dispatch is available.
Operational Zone Covered Localities (Nadia) Turnaround Timeline Network Infrastructure
Zone A (Core Hub) Kalirhat, Natun Durgapur, Near Sani Mandir, NH12 Corridor Same-Day to 24 Hours Direct Primary Fiber Distribution Ring
Zone B (Urban Nadia) Krishnanagar, Ranaghat, Shantipur, Nabadwip, Taherpur 24 to 48 Hours Multi-MSO Optical Trunk & Sub-Splitter Nodes
Zone C (Extended Nadia) Chakdaha, Kalyani, Nakashipara, Tehatta, Chapra, Karimpur 48 to 72 Hours Partner Network Distribution Feeder Lines
Handover Protocol

Subscriber Handover & Proof of Delivery (POD) Checklist

To ensure complete transparency and total service satisfaction, please verify each item with our installation engineer before signing the Installation Verification Slip:

1. Technician Identity Verification Verify official Sky Luck photo identity card and uniform before granting premise access.
2. Optical Signal Level Check Technician must demonstrate optical Rx reading between -18 dBm to -24 dBm on the power meter.
3. Live Speed Demonstration Witness live Ookla or Fast.com speed test demonstrating 100% of subscribed bandwidth over LAN and 5GHz Wi-Fi.
4. Channel Bouquet Activation For digital cable subscribers, verify all selected Bengali, news, entertainment, and sports channels render in Full HD.
5. Wi-Fi Password Security Setup Custom Wi-Fi Network Name (SSID) and strong WPA3 passphrase configured according to your personal choice.
6. Official Tax Invoice Receipt Receive printed or digital tax receipt displaying Sky Luck GSTIN 19ARWPS6326C1Z8 and PAN ARWPS6326C.
Common Questions

Frequently Asked Delivery & Setup Questions

In core coverage localities across Nadia (such as Kalirhat, Natun Durgapur, Near Sani Mandir, and adjacent NH12 areas), installations are typically completed within same-day to 24 hours. For extended locations across Nadia district, setup is guaranteed within 24 to 48 hours following feasibility confirmation.

No. All installation fees, plan subscriptions, and equipment security deposits are strictly governed by our published tariffs and confirmed at the time of booking. Never pay unauthorized cash tips or unofficial extra charges. Every legitimate payment must be acknowledged with an official Sky Luck GST receipt.

Standard residential installations include up to 100 meters of outdoor optical fiber drop cable free of charge from the nearest distribution splitter. For premises exceeding this threshold, nominal per-meter cable extension charges apply as per our transparent standard rate sheet.

Optical signal power measured in dBm dictates the stability and throughput of your internet connection. A signal between -18 dBm and -24 dBm represents the optimal operating window for GPON/EPON terminals, ensuring zero packet drops, lowest possible latency for gaming/video calls, and maximum longevity of the laser optical transceivers.

Yes. You can reschedule your installation slot at any time prior to technician dispatch by calling our Nadia customer helpline at 9233231999 or sending an instant WhatsApp message to 9233231999.
Official Business Identity Verification

Entity: Sky Luck (Proprietor: Biplab Kumar Saha)

Operating Facility: NH12, Natun Durgapur, Kalirhat, Near Sani Mandir, Nadia, West Bengal – 741102

GSTIN: 19ARWPS6326C1Z8 | PAN: ARWPS6326C

Inquiries: bipadsaha7@gmail.com | 9233231999 / 9933144813